…Whether or not you are well-versed in architectural vocabulary, you probably have an opinion about how buildings look.  Here is your opportunity to weigh in on the Lincoln School project! The SBC spent significant time talking about the floor plan for the new “heart” of the school, now it’s time to make a decision about what it will look like in 3D. Come help us! Provide your input at one (or both!) of the Community Workshops on Thursday, November 1st (8am AND 7pm). The SBC reviewed several options at its October 24th meeting.

  • At the Workshops, we will take a look at the front (main entrance and commons) and the back (3rd grade wing and media center) of the building.
  • Our design team will present a couple choices based on the SBC’s guidance and will ask for your feedback.
  • See you in the Reed/Brooks Gym!

What’s in the Project? During the recent “value-engineering” process, the SBC considered the cost/value of about 100 items as it made decisions about how best to use the $93.9M budget to meet Lincoln’s core values. The SBC strived to make thoughtful decisions that would protect the integrity of the Lincoln School project, which will be transformational!

  • Centering the School: The life of the school will be focused on the center of the building – the co-location of the media center (library), flexible learning space, and dining and kitchen facilities will allow students and faculty to come together, interact, and collaborate in new ways.
  • Fostering Collaboration: In grades 3 – 8, classrooms are grouped in neighborhoods centered on shared learning spaces (“hubs”). The hubs support an educational model focused on flexible groupings, differentiated instruction, and fostering age-appropriate independent learning.
  • Connection to the Campus: Students currently eat in gyms with no views to the outdoors. In contrast, the new dining commons will open out to the center field. The media center and the learning commons will both have views out to the woods and fields to the west of the school.
  • Sustainability: The school will switch from natural gas to an electric climate control system – paired with solar energy generation, the goal is a Net Zero building; new insulation and windows; and lower-maintenance, sustainable materials.
  • Safety and Accessibility: Improved pathways for pedestrians and cyclists; better site lighting; secure and accessible entryways; connection and integration of the Reed Gym with the Auditorium and the rest of the building.
  • A Community Resource: The new center of the school, flexible-use spaces, and the refurbished Auditorium and gyms will enhance the school as a community resource during non-school hours.

November Outreach Events – All Events Open to Everyone!

Meetings of Interest:

  • Finance Committee: November 5th, 7:30pm, Donaldson Room
  • SBC Regular Meeting: November 7th, 7:00pm, Hartwell

0 Comments

There are no comments yet

Thoughts? Comments? Questions?

Discover more from Lincoln School Building Project

Subscribe now to keep reading and get access to the full archive.

Continue reading