Getting Caught Up

On Wednesday the School Building Committee hosted two Community Workshop sessions. There was a great cross-section of the community represented both in the morning and in the evening, and we thank everyone for making time during what is always a hectic week!

The presentation focused on six main areas of the project: the floor plan (where are all the rooms?); the new flexible hub spaces in grades 3 – 8; the central entrance & Commons; the site (how do we make cars, cyclists and walkers all happy?!); sustainability; and phasing (where does everyone go while we’re renovating?) Click here to see the slides from the presentation. Video of the Workshop is available at www.lincolntv.viebit.com.

At the next SBC meeting on September 12th, the committee will sign off on the schematic design and send the plans to the cost estimators. This does not mean that all the design work is done – the details are fleshed out during the design development phase (which comes after the December bond vote) – but this current phase establishes the major design and construction components of the project.

Outreach Events: Couldn’t make it to the workshops? Take the opportunity to talk directly to SBC members at these two upcoming events:

  • Thursday, September 13th – PTO Welcome Back Picnic, 5:00 – 7:00pm, Codman Pool parking lot.
  • Friday, September 14th – Bemis Hall, 1:00pm

 

0 Comments